Project

Key Features

  • Pre-Feasibility Study completed in Q2 2021

  • Prioritizes the development of the near-surface/ higher-grade multi-million ounce reserve as a standalone operation

  • PFS demonstrates an operation with a mine life of 14 years and total production of 2.1 million gold ounces characterized by:

    • Robust production profile: average annual production >180k ounces (first 6 years) & >150k ounces (Life of Mine)

    • Average all-in-sustaining cost $707 per ounce (first 6 years) & $801 per ounce (Life of Mine)

    • Excellent infrastructure & access of the Project’s location translated into modest initial capital requirements of C$607m (US$461m) for the construction of a sizable operation (mill throughput of 20,000 tonnes per day)

  • Environmental assessment/ permitting process underway

  • Ongoing resource drilling programs to further expand the multimillion ounce resource

 